postheadericon How to fix the house the first phase of the El Triunfo

house the first phase of the El TriunfoToday, Monday 25 May, have begun the first phase of improving the homes of El Triumph (18 improvements in total). The present home was built with two rows of concrete slabs and three rows of wattle and daub panels have suffered a rapid deterioration due to weather conditions in the area. Wattle and daub panels have been husked time and wood roof structure has been affected by termites. The ASF-Galicia proposal is summarized in the following lines:

-Replace the wattle and daub pinches by concrete plates. We decided to paint the house plastered and to cover imperfections in the joints between the plates and pillars, small animal inhabited dangerous.

-Improve the seismic behavior of the apartment with a beam attached to the foundation and one in the Coronation.

“Change the deck of a structure and sheet metal roofing tile micro concrete, developed in the manufacturing plant by a group of women.

-Changing the shape of the housing. The proposal addresses chosen by the community housing with a large square room, eliminating the two corridors. This design proposes a single multifunctional space was chosen for better adapted to the various family events.